Day 342

As promised, I have a few more photos of the install. Everything is coming along beautifully. I wish you could see the craftsmanship that has gone into everything Martín has made. He does such a wonderful job.

You can only see part of the third shelf, but I think you have the idea of what it looks like. (If someone would please move all of that junk out of the way)?
These are on the wall straight as you come in the door; opposite to the previous photo.
Two thirds of the flower box. It is everything I wanted, and more. Ivan was the one to ask them to make it deep enough so the plastic boxes would not be seen.

They need to come back, again, as there are some things that need to be finished, and one item that needs to be changed.

The cabinet under the fermentation station was just a centimeter too wide, and two millimeters too tall.

Not to worry, though. Martín is all over it.

While we wait for him to adjust that, stay happy, stay healthy, stay safe. Wash your hands, cover your mouth, and protect your loved ones.